D-1 |
Study and Survey Grant Application (pdf)
(xls) |
| D-3 |
Project Application (pdf)
(xls) |
| Form SPI 1066 |
Enrollment Classroom Count 2012-13 (Word) |
|
D-5 |
Application for Preliminary Funding Status
(pdf) (xls) |
|
D-7 |
Application to Proceed with Bid Opening (pdf)
(xls) |
| D-7ASF1 |
Summary of Assignable Square Feet(ASF) by Building--Instructions
(pdf) (xls) |
|
D-7ARE1 |
Area Analysis Summary Form (pdf)
(xls) |
|
D-7ARE2 |
Area Analysis Worksheet (pdf)
(xls) |
|
D-9 |
Application for Authorization to Sign
Contracts (pdf)
(xls) |
| D-9 GCCM |
Application for Authorization to Sign MACC Agreement (pdf)
(xls) |
| D-11 |
Application for Release of Retainage (xls) |
|
|
|
|
|
D-5 |
Submit the preliminary WSSP Scorecard with the D-5 |
|
D-9 |
Submit the following:
- Design-phase WSSP Scorecard (update of preliminary scorecard)
- Estimates of costs or savings of implementing WSSP
The scorecard and cost information can be combined on one sheet
- Sustainable Building Strategy (2-4 page summary of sustainable features selected)
- Energy Model Summary (summary page of ELCCA)
|
|
D-11 |
- Final WSSP Scorecard (update of design-phase scorecard)
- Final Cost information (update of estimated cost information)
- A certified letter with the D11 stating that the scorecard and cost
information has been submitted and accurately reflects the project, and that
annual reporting will take place for five years.
|
|
Annual Report |
Districts must report to OSPI every year for five years
after occupancy on the operational costs and savings of schools built to
this standard. |
These and other documents relating to
High-Performance Schools and the Washington Sustainable Schools Protocol are
found on the
Web site.
|
|
|